Call our team on 01432 000000 Mon–Fri 8am–6pm, Sat 9am–1pm mail@herefordtiling.co.uk

Tiled floors and underfloor heating belong together — tile conducts heat better than
any other floor covering. The detail that matters is what goes between them.

The build-up

Insulation boards go down first wherever we can fit them: they stop heat disappearing into the
slab and cut warm-up time from an hour to minutes. Then the mat or cable, then a flexible
adhesive and grout rated for thermal movement. Standard adhesive on a heated floor will crack.

Commissioning

Heating stays off until the adhesive and grout have fully cured, then comes up gradually over
several days. We’ll leave you written instructions, and the electrical connection is signed off
by a qualified electrician.

What's included

  • Electric mat and loose-cable systems
  • Insulation boards to cut warm-up time
  • Flexible adhesive and grout rated for heat
  • Thermostat positioning and floor probes
  • Connection by a qualified electrician

Thinking about a tiling job?

Send a few details and we'll come out, measure up and give you a written quote — free, with no pressure.

Call Get a quote