Bathroom tiling
Walls and floors tiled, sealed and finished — from a single bath panel to a full refit.
Bathrooms are where tiling either works or shows every shortcut. Most of the work
happens before a single tile goes up: checking the walls are flat, boarding out where plaster
won’t hold, and tanking anything that will get wet.
What we do
We tile baths, showers, splashbacks, full walls and floors. Large-format porcelain, classic
metro brick, mosaic feature strips and natural stone are all day-to-day work for us. If you’ve
already bought your tiles, we’ll work with them; if not, we’ll tell you what fits the room and
your budget before you spend anything.
How long it takes
A bath and splashback area is usually a day or two. A full bathroom — floor and all four walls —
is typically three to five days including grouting and sealing, and we stagger it so you aren’t
without a working bathroom longer than necessary.
Prep we don’t skip
Plasterboard behind a shower gets replaced with tile backer board. Junctions between walls and
trays get a tanking kit, not just extra silicone. Floors get checked for movement and, where
needed, overboarded — a floor that flexes will crack grout no matter how good the tiling is.
What's included
- Wall and floor tiling in ceramic, porcelain or stone
- Waterproofing behind baths and showers
- Niches, shelves and tile trims cut to size
- Silicone and grout finished in matching colours
- Old tiles and debris taken away
Bathroom tiling we've done
Customers on this work
Re-tiled our bathroom from top to bottom. Turned up when they said, dust sheets down every day, and the cuts around the window are spot on. Quote didn't change by a penny.
Thinking about a tiling job?
Send a few details and we'll come out, measure up and give you a written quote — free, with no pressure.