Call our team on 01432 000000 Mon–Fri 8am–6pm, Sat 9am–1pm mail@herefordtiling.co.uk

The old concrete floor had a 22mm dip across the middle of the room, which we filled with
self-levelling compound and left to cure before tiling.

900×600 porcelain, back-buttered for full adhesive coverage, with movement joints at the
thresholds. Laid in a straight stack to keep the long joints running with the room.

More of our work

Thinking about a tiling job?

Send a few details and we'll come out, measure up and give you a written quote — free, with no pressure.

Call Get a quote